Tuesday, December 8, 2009

Countertops!

We finally have a fully functional kitchen! The countertops are installed and the Blue Pearl granite looks beautiful:


Monday, November 30, 2009

Cabinet Installation

Here are the wall cabinets in place after cutting, pre-drilling, and anchoring:

Doors and base cabinets in place. I'm working on the frame for the undermount sink:

Sink in place, waiting for counter and a back splash:



Monday, November 23, 2009

Cabinets!

Our cabinets arrived this morning and were waiting for me in boxes when I return tonight!

After some wrestling with large boxes and cabinets, I got them in to place. These are the base cabinets on the window side...(the fridge will have a matching door as well).

This is the other side (which required some cutting to accommodate the plumbing):

Pixie is already thinking about jumping on the counter!

These are the wall cabinets waiting to be lifted and cut...maybe I'll work on them tomorrow night:

Tuesday, November 10, 2009

View from our window last Saturday...a barge with gutted subway cars!

Tuesday - 11/10/09

We're slowly getting moved in to our new home. Here are some pictures!

Entryway:

Living room (dining table will go to the right of the window):

Living room:


Hallway to kitchen and bathroom:

Bedroom with walk-in closet:

Unfinished but functional kitchen. Who needs more than 10" of counter?


Friday, October 9, 2009

Thursday - 10/8/09

We're moved in!!

There's still some work to be done (kitchen cabinets, closet shelves, and light fixtures) but having a home has never felt so good!

Pictures will come later...

Wednesday, October 7, 2009

Wednesday - 10/7/09

The floors are done! Move-in is scheduled for tomorrow!

Here's the living room:

The living room and part of the bedroom/hallway window:
The bedroom/hallway window:

Bedroom (looking out):

Bedroom (looking in):

Tuesday, October 6, 2009

Tuesday - 10/6/09

Finally, a toilet and sink! The toilet is a Toto flushometer-type, the only kind that would fit in that corner. (The sink is on a temporary stand until I can make a cabinet with a marble top.)

Monday, October 5, 2009

Monday - 10/5/09

Saturday's photos are a little deceiving...we won't be able to move in until Thursday. By then the floors will have their final coat and the bathroom fixtures and all the electrical work will be done.

True to the title of this blog, we just moved to the fifth temporary living situation since all of this began. We hope that this will be our last!

Saturday, October 3, 2009

Saturday - 10/3/09

Trust me, the floors are even more beautiful in person! (click on the photos to enlarge them)

Friday, October 2, 2009

Friday - 10/1/09

We're in the home stretch! All the tools, etc. we moved into the kitchen yesterday and the maple floors are ready for finishing today. Here are the floors before sanding:

The bedroom (unfinished floor):
Tiling and trim work in the bathroom is complete! All that's left is grouting, sealing the marble, painting and installing the fixtures.
Here's the shower with the toilet in its box...with the beautiful white marble sill:

Thursday, October 1, 2009

Thursday - 10/1/09

It's already October...and we're still nomads!

New pictures are coming...dead camera batteries last night meant no pictures...

Monday, September 28, 2009

Monday - 9/28/09

Today is a holiday - no work allowed in the building :-(

Sunday, September 27, 2009

Friday - 9/25/09

We have tile on the bathroom floor!

And here is part of the tile on the kitchen floor...


Thursday, September 24, 2009

Thursday - 9/24/09

Slowly but surely!




Note the boxes for the stove and the fridge...

Wednesday - 9/23/09

The bathroom walls are being tiled! Here is part of the shower, a classic 3"x6" subway tile with a marble weave accent:

Wednesday, September 23, 2009

Tuesday - 9/22/09

Here are some pictures with paint on the walls in the living room:

This is the bedroom painted "Italian Ice Green":


And the shower walls are finally enclosed and the lead pan installed - ready for tiling!

Monday, September 21, 2009

Monday - 9/21/09

We passed the DOB plumbing inspection this morning! We can (finally) proceed with closing up the bathroom walls and tiling...

Hopefully some new pictures tomorrow.


Friday, September 18, 2009

Friday - 9/18/09

We are up to painting and mouldings in all rooms except the bathroom...

Primed French doors, walls, and mouldings:
New baseboards (plumbing valve will be covered soon):
Living room window:
Partial partition next to kitchen door (counter will be behind it):
Bedroom/hallway window with trim and baseboards:

We picked the wall colors last night!