Monday, August 17, 2009

Monday - 8/17/09

Lots to report today!

The plumbing inspection went well this morning all the pipes passed! Here is the new supply, vents, and waste piping for the sink and toilet.

And here is the rough-in for the shower...

Skim-coating continues on the living room, bedroom, hallway, and kitchen and the insulation on the bedroom partition was installed today.

On Friday the began leveling the subfloor throughout the apartment so that it will all be one level.

The picture below shows the insulation in the new partition. Notice the big pile of boards in the foreground of the photo below, that is our new maple flooring.

The framing that was exposed last Wednesday (see post for 8/12/09) was covered in drywall today and the intercom wiring was concealed in the center column in the photo below.

Finally, here is a sample of the unfinished 4" maple flooring. It will be even more beautiful when it is sanded and coated!