We finally have new pictures to post and lots of progress has been made!

All the hardwood flooring is installed. It will be sanded and finished once we get most of the plastering and painting done.

All of the windows are now installed and the jambs and sills have been installed on the living room and bedroom windows. The windows look even better when the rough masonry is covered!


Below is a picture of the rough plaster for the cove molding in the living room. This plaster molding is being done by hand to match the original molding on the other three walls in the living room.

Here is a view looking from the living room towards the kitchen. The hot and cold water risers are finally covered (they are in the column on the right).

This picture is in the kitchen where steam riser piping is being covered up.